1.a document that sets out changes to a previously negotiated contract
1.The site section of the BOM can be modified through a revision change or an SCO (site change order) .
BOM的站点内容可以被编辑在版本更改时或者一个站点变更单。
2.Take the construction change order as the basis of final account for completed project and the time limit delay.
以工程变更单作为竣工结算和顺延工期的根据。
3.In charge of the implementation of ECOs (engineering change order) in the plant. Maintain technology document and BOM in WINCHILL system.
负责工程更改通知单的执行。在系统里维护技术文件和材料清单。
4.If there is a change order during the construction period, the change order shall adopt the unit rate price of the contract.
如果在基建期间有工程变更通知单,这个变更通知单应该采取合同的单价价格。
5.A copy of the change order is kept in the hotel safe until funds are received.
更改顺序的副本保存在酒店安全直到收到资金。
6.The presented scenario shows collaboration in the context of engineering change order.
视频展示了在工程变更单情景下的协作。
7.Identify the potential change and create a potential change order file.
确认潜在的变化并创建一个针对潜在变化的顺序文件。
8.Step 2. Identify the potential change and create a potential change order file.
确定可能的变更项并拟出可能的变更令文件。
9.Change order of images on flash banner. Same images as now.
更改影像的顺序上闪光的旗帜。像现在一样的图像。
10.Schedule impact assessment to Change Order.
对变更的进度评估。